Transformer Testing

GDBZ-IV Transformer Test Bench

Virtual-instrument based transformer test bench in which a PC controls the entire test sequence, covering oil-immersed transformers up to 63000 kVA / 110 kV, dry-type transformers up to 31500 kVA / 35 kV and flameproof mining transformers up to 6300 kVA / 10 kV.

GDBZ-IV Transformer Test Bench

Overview

Virtual-instrument based transformer test bench in which a PC controls the entire test sequence, covering oil-immersed transformers up to 63000 kVA / 110 kV, dry-type transformers up to 31500 kVA / 35 kV and flameproof mining transformers up to 6300 kVA / 10 kV.

Application Scenarios

Factory acceptance testing of oil-immersed transformers up to 63000 kVA / 110 kVRoutine testing of dry-type transformers up to 31500 kVA / 35 kVTesting of flameproof mining transformers up to 6300 kVA / 10 kV

Request Specifications & Quotation

Tell us your test object ratings, the test items you need and the applicable standards. Our sales engineers reply with a configuration proposal and a formal quotation within 24 hours.

Get a Quote

Detailed Description

Overview: the GDBZ-IV microcomputer-based transformer test system uses the latest virtual instrument technology, combining the powerful data processing capability of the computer with the excellent hardware control capability of the industrial control computer. The PC controls the entire test process and processes the data through the system software; the whole test process is completed with one key, achieving genuine operator dialogue and fully automatic operation.

Control and measurement system: the test system runs on the Windows operating system and the test software operates in a fully Chinese-language environment. During testing the operator clicks the corresponding button and the whole test item is completed automatically, with all test data displayed on screen in real time. The control section of the test equipment uses advanced control technology such as PLC. The test software includes password protection, so the operator enters an ID and password to reach the test interface. The factory test report and print format can be designed to the customer’s own draft, and after a test the report can be printed directly or edited before printing (limited to the test items). A mechanical emergency stop button is provided on the bench to protect personnel, equipment and the test object in an emergency.

Test capability: oil-immersed transformers up to 63000 kVA at 110 kV and below (including S9, S11, S13 and amorphous alloy transformers); dry-type transformers up to 31500 kVA at 35 kV and below; flameproof mining transformers up to 6300 kVA at 10 kV and below; and special transformers, for which the detailed capacity and voltage class must be advised at the time of order.

Test items: transformer winding resistance test; transformer voltage ratio measurement and connection group number test; transformer no-load current (%) and no-load loss test; transformer short-circuit impedance (%) and load loss test; transformer power-frequency applied withstand voltage test; and transformer induced withstand voltage test.

Extendable test items: transformer partial discharge test; no-load harmonic test (0-31st harmonic); transformer oil withstand voltage test (0-80 kV); transformer temperature-rise test (with automatic plotting of the temperature-rise curve); insulation resistance test (absorption ratio and polarisation index); transformer anti-interference dielectric loss / tan delta test; and lightning impulse test.

Technical Specifications

Oil-immersed transformersUp to 63000kVA, 110kV and below (including S9S11S13 and amorphous alloy transformers)
Dry-type transformersUp to 31500kVA, 35kV and below
Flameproof mining transformersUp to 6300kVA, 10kV and below
Special transformersDetailed capacity and voltage class to be advised at time of order
BrandGaodian Electric

Frequently Asked Questions

What is the GDBZ-IV Transformer Test Bench used for?
It is a microcomputer-based transformer test system using virtual instrument technology. It covers oil-immersed transformers up to 63000 kVA at 110 kV and below (including S9, S11, S13 and amorphous alloy transformers), dry-type transformers up to 31500 kVA at 35 kV and below, and flameproof mining transformers up to 6300 kVA at 10 kV and below. Special transformers are also catered for, in which case the detailed capacity and voltage class must be advised at the time of order.
How is the test sequence controlled?
The control and measurement system runs on Windows with fully Chinese-language test software. During testing the operator clicks the corresponding button with the mouse and the whole test item is completed automatically, with all test data displayed on screen in real time. The control section of the test equipment uses advanced control technology such as PLC, and the test software is password protected so that the operator enters an ID and password to reach the test interface. A mechanical emergency stop button is fitted on the bench for emergencies.
How do I get a quotation?
Email your transformer types, capacity and voltage classes, and the test items you need, to bowen@harchin.com. Benches are manufactured in our Nanjing facility and quoted directly from the factory; we can also prepare the factory test report format to your own draft.

Need the datasheet for this model?

Send us this product name plus your test requirements. We reply with specifications, photos and a formal quotation.